Network Upgrades and Maintenance
Date
Start Time
Duration
Realm
Task Descriptions
04-29-19
9:00 AM
5 days
XRAY
Enable beamline network security for Sectors 4 and 12.
05-06-19
9:00 AM
2 days
Accel
Upgrade accelerator time servers
05-07-19
9:00 AM
2 days
Accel
Enable mac authentication testing on network switches swsr01 and swsr03.
05-15-19
9:00 AM
2 days
XRAY
Install additional high-speed network switch at Sector 6 Beamline.
Accelerator Linux Servers/Clients Patch Updates & Maintenance.
Date
Start Time
Duration
Task Descriptions
04-29-19
11:59 PM
1 day
05-06-19
Accelerator virtual server updates (accelerator DNS, Web, NFSv2 and print/l=
i04nsing services).
04-30-19
9:00 AM
12 Noon
1 day
Accelerator LDAP servers.
05-01-19
Accelerator hypervisor updates.
11:59 PM
1 day
05-06-19
Controls virtual server updates (accelerator PV gateways, Controls apps, so=
ft IOCS's voltctl).
05-02-19
9:00 AM
11:59 PM
1 day
Accelerator standalone servers (NetBackup, picoharps, data loggers, CCTV*).
05-03-19
4:00 PM
1 day
Controls hypervisor updates.
IRMIS server updates.
05-06-19
9:00 AM
1 day
Accelerator hypervisor updates.
05-06-19
9:00 AM
1 day
Controls hypervisor updates.
05-06-19
9:00 AM
1 day
Xray user PV Gateway servers.
05-07-19
1:00 PM
1 day
IRMIS Server Hardware Upgrade.
05-07-19
11:59 PM
1 day
Diagnostics accelerator workstations
05-08-19
12 Noon
1 day
MBA Controls DAQ systems
Xray Storage Servers Maintenance
Date
Start Time
Duration
Task Descriptions
05-08-19
07:00 AM
2.5 hrs
Xray Netapp Storage Appliance OnTap OS upgrade to 9.5P1 - impacting file sh=
aring resources on Aquila, Joules, s1data1, s3data, s4data, s6bmdata, s6idd=
ata, s7data, s8bmdata, s9data, s11bmdata, s11iddata, s12data, s17bmdata, s2=
0data, s26data, s27data, s29data, s30data, s32data, s33data and s100data30.
05-09-19
09:00 AM
5 days
Four new nodes and storage capacity will be added to the Xray Netapp Storag=
e Appliance. Tentative start date, equipment arrival
Xray Linux Servers Maintenance
Date
Start Time
Duration
05-09-19
Task Descriptions
05-02-19
09:00 AM
9:00 AM
2 days
Migrate Xray Blade Chassis BC1 to OneView Infrastructure Management.
05-06-19
9:00 AM
Four new nodes and storage capacity will be added to the Xray Netapp Storag=
e Appliance. Tentative start date, equipment arrival
2 day
Migrate Xray Blade Chassis BC2 to OneView Infrastructure Management.
Xray Linux Servers/Clients Patch Updates
Date
Start Time
Duration
Task Descriptions
Duration
05-05-19
11:59 PM
Task Descriptions
1 day
Sector 27
05-06-19
05-05-19
11:59 PM
1 day
Sector 9
05-05-19
11:59 PM
1 day
Sector 6
05-06-19
11:59 PM
1 day
Detector Pool(Optics Group next shutdown)
05-06-19
11:59 PM
1 day
Sector 30
05-06-19
11:59 PM
1 day
Sector 3
05-06-19
11:59 PM
1 day
Sector 17-BM(dserv only)
05-07-19
11:59 PM
1 day
Sector 20,23(dserv only)
05-07-19
11:59 PM
1 day
Sector 11-BM, 11-ID
05-08-19
11:59 PM
1 day
Sector 2
05-08-19
11:59 PM
1 day
Sector 32
05-09-19
11:59 PM
1 day
Sector 8
05-09-19
11:59 PM
1 day
Sector 26
05-12-19
11:59 PM
1 day
Sector 12
05-12-19
11:59 PM
1 day
Sector 33
05-12-19
11:59 PM
1 day
Sector 34
05-13-19
11:59 PM
1 day
Sector 4
05-13-19
11:59 PM
1 day
Sector 29
05-14-19
11:59 PM
1 day
Sector 7
05-15-19
11:59 PM
1 day
Sector 1
05-16-19
11:59 PM
1 day
DCS
05-16-19
11:59 PM
1 day
CATs(dservs)
05-16-19
11:59 PM
1 day
s100dserv
05-20-19
11:59 PM
1 day
XRAY RHEV VM updates
05-20-19
5:30 PM
1 day
Excluded systems at 1ID ("Bassani" and "Albinoni").
05-20-19
9:00 AM
5 days
XRAY RHEV Hypervisors updates.
05-21-19
11:59 PM
4 days
Non-Dserv XRAY standalone Servers.
05-21-19
8:00 AM
6 days
If needed: Cleanup any issues and verify systems are ready for the Run.
06-10-19
11:59 PM
1 day
Sector 6
Xray Windows Servers/Clients
Date
Start Time
Duration
Task Descriptions
04-26-19
8:00 AM
22 days
Push WSUS updates for clients with a deadline 5/18/2019 at 11:00 PM.
04-29-19
8:00 AM
14 days
8:00 AM
Move Virtual XRAY Servers to new cluster/hardware.
05-06-19
14 days
8:00 AM
5 days
Move Virtual XRAY Servers to new cluster/hardware.
Upgrade XRAY SpecOps Server and Client (client will be updated on reboot.
05-15-19
8:00 AM
4 days
Push WSUS Patch Tuesday Updates for clients with deadline on 5/18/2019 at 1=
1:00 PM.
05-15-19